Skip to content
Revival
Indoor spa pool in a white vaulted room, timber doors open to planting outside

Hotel spa design · Nepal

Hotel spa design that survives the operating year.

A hotel spa earns its floor area twice: from guests who pay for treatments, and from guests who chose the property because of it. Both depend on the facility being open.

That makes uptime the design brief — commercial-duty equipment, plant that can be serviced without closing the room, treatment sized for continuous use, and spares held in country.

A 40-room resort spa, indicative

Wet area
About 112 m²
Systems
Sauna, hammam, whirlpool, plunge
Capacity
Roughly 24 guests per hour
Electrical load
About 38 kW peak
Programme
16 weeks, phased around occupancy

What actually decides it

  • 01

    Involve the systems early

    Plant location, drainage and supply routes are cheap to move on a drawing and expensive to move on site.

  • 02

    Design the guest sequence

    Changing, heat, cold, shower, rest. If the sequence does not work as a circuit, the facility reads as a set of rooms.

  • 03

    Budget the maintenance

    An AMC written into the capital budget is far easier than one found in year two after the first failure.

Questions

When should Revival be involved in a hotel project?
At concept, before the MEP layout is fixed. We issue load, ventilation and drainage requirements your design team can coordinate against.
Can you work to an operator's brand standard?
Yes. We specify to the standard and flag anywhere the local supply, water or logistics would compromise it.
Do you provide drawings for tender?
Yes — drawings, load schedules, BOQ language and specification text. We are happy to be basis of design or one of three tendered.

Tell us the room.

Dimensions, the supply you have, and what you want to happen in it. We will come back with a system list and an indicative budget.